Road work is scheduled to begin on Rugby Mines Road just east of South Mountain on December 4th. Mike Ferrao will be reducing the grade on the steep hill to improve travel during the winter months. The road work is scheduled between December 4th to 15th between 9 AM and 4 PM. During this time the road will be closed, so please use another route.
top of page
Search
Recent Posts
See AllSnow report: light and fluffy snow currently at 5 inches on Rugby mines and still coming down and very likely to reach 6 inches today. We...
65
Good morning, neighbors. Snow measurements are showing 4 to 5 inches total accumulation on roads and on snow cameras that I'm able to...
80
The BHR POA Board of Directors have created a new initiative called BHR Connect. What: every other month starting on January 25, 2025,...
38
bottom of page
Bình luáºn